1. Define the data and the unpowered interval

Record when the data is written, the programming temperature, the longest unpowered interval, and the temperature profile during storage. Identify when the data must next be read and whether this happens early or late in service. Keep design targets, datasheet specifications, and project validation results separate.

Define acceptance before reviewing the device. Specify the data, operating conditions, readback scope, error handling, and acceptance method. A successful startup read or an ECC status report alone does not validate the complete operating range.

If the project uses UBER, define the denominator, measurement scope, test method, and acceptance requirement. Do not transfer an SSD-level target directly to raw NAND. W25N01GV ECC status provides limited result categories. It does not independently reveal quantitative correction margin, the complete per-codeword error distribution, or UBER.

For W25N01GVZEIG, confirm that the document covers the full ordering suffix. Check the conditions and ECC notes attached to each rating. This is document review, not a retention guarantee for a project or NAND family. For the earlier technology choice, see our NOR Flash vs NAND Flash comparison.

2. Separate retention from program erase endurance

Retention concerns programmed data over time. P/E endurance concerns repeated program/erase use under stated conditions. A cycle rating cannot be converted directly into unpowered years. Check wear, temperature, and the required interval together.

Revision R lists 10-year retention and 100,000 P/E cycles separately. This does not establish that every wear, temperature, and ECC combination meets both ratings. Missing joint conditions also do not prove that the ratings are incompatible or necessarily apply under different conditions. Obtain evidence for the actual combination.

Table 1 What each reliability term describes
MetricMeaningWhat it does not establish alone
Data retentionReliable retention of programmed data under stated conditions; check applicable ECC requirements separatelyThe same duration at every wear state
P/E enduranceRepeated program/erase capability under stated conditionsNominal retention duration at end of life
TBWA cumulative-write metric at the applicable product levelRaw NAND retention in years
Storage-temperature ratingTemperature boundaries defined by the documentRetention duration at that temperature
ECC configurationOn-die or host-side error-correction capabilityRetention duration or project acceptance

3. Record temperature profiles and prior wear

Use documented inputs. Keep measured history separate from design estimates, and state the estimate’s basis. Do not replace missing information with ideal conditions. Record programming temperature, unpowered-storage temperature, and readback temperature separately.

The applicable device documentation and project requirements determine whether cross-temperature validation is needed and how to perform it. Do not transfer SSD-level temperature combinations to this raw NAND device. The same average raw BER also does not establish a higher uncorrectable-error rate. That conclusion needs evidence about coding, error distribution, and device conditions.

Record the relevant blocks’ P/E history or a supported design estimate. The same part number does not establish equal retention capability for new and worn devices. Review the specified operating range and reasonable worst-case conditions. Without an applicable model or validation basis, average use does not justify nominal years or a calculated ECC margin.

KIOXIA’s March 2024 data-retention brief Rev 1.0 discusses the influence of P/E accumulation and temperature. It concerns managed flash. We use those qualitative review inputs here. Its curves, numerical examples, and controller assumptions are not retention guarantees for this raw NAND device.

4. Match project conditions to manufacturer evidence

The W25N01GV datasheet dated July 3 2023 Rev R lists retention and endurance separately on printed page 6. The endurance item has an ECC note. Printed page 56 separates absolute-maximum storage-temperature ratings from operating conditions. Do not combine these entries into a guarantee for arbitrary project conditions.

If the evidence does not cover the required wear, temperature, and offline-time combination, request clarification or additional support. Do not approve or reject the retention requirement on those separate ratings alone.

Table 2 Match project inputs to device evidence
Project inputApplicable evidenceReview record
Complete ordering codeApplicable datasheet and revisionConfirmation that the suffix is covered
Service stage and P/E stateRetention conditions for the relevant wear stateHistory or estimate and its basis
Programming, storage and readback temperatures; longest offline intervalRetention evidence covering the combinationUncovered conditions
Retention acceptance criteriaData-check scope, error handling, applicable statistics and ECC configurationCriteria and responsible owner
On-die ECC configurationEnable state, correction capability and status-read methodImplementation and verification records
Additional host-side ECC and data managementCapability and relevant worst-case validationResponsible owner and missing evidence

On-die ECC is not a complete managed-device guarantee. Raw NAND does not universally lack ECC, either. Use the SPI NAND selection guide if interface, ECC, or host responsibilities remain unclear. Then return to the exact device’s retention conditions.

5. Record a conditional review decision

State the part, document revision, temperature profile, service stage, P/E state, and ECC configuration covered. Separate supported requirements from open questions. Keep uncovered conditions pending clarification. The responsible engineers determine additional validation and acceptance criteria.

A brief power-on or one read does not establish completed refresh. If refresh is part of the design, check the actual mechanism, coverage, and completion. Record which data was checked, which at-risk data was rewritten or migrated, and how uncovered data and interruptions are handled. Maintenance intervals need support for the applicable use conditions and mechanism.

KIOXIA’s August 2024 managed-flash refresh brief Rev 1.0 describes scanning and migrating at-risk data as needed. This does not require rewriting every datum on each pass or establish equivalent built-in functionality in W25N01GV. Check copying, rewriting, maintenance, and power-loss protection for their actual functions. A refresh mechanism alone does not validate retention. We provide no universal refresh interval or test acceptance decision.

Keep the ordering code, offline requirement, temperature profile, P/E history, ECC configuration, and acceptance criteria in the sourcing record. Review candidates against the applicable document revision, temperature, and wear conditions. For a SUNTEC quotation, provide the part number, quantity, and retention conditions that still need clarification.

Prepared by the SUNTEC Technical Team at Suzhou Shengyatai Electronics Co., Ltd.