GD32L233CCT6 is a GigaDevice GD32L23x (low-power Cortex-M23 MCU) part. Spec: Cortex-M23 64MHz, 256KB Flash / 32KB SRAM, LQFP-48, 1.71~3.63V, industrial -40~85°C. Typical applications: Battery-powered devices, smart meters, portable instruments, low-power IoT terminals.
Enter the quantity and your email. We reply to routine RFQs within 1 business day and provide a sourcing proposal for complex BOMs within 2 business days. Weekends and public holidays are excluded. These are response and proposal times, not shipping times; lead times are confirmed per order.
Or email your Excel BOM to suntec@suntecele.com with quantities and target delivery date.
Need the datasheet or samples? Request the GD32L233CCT6 datasheet · Request GD32L233CCT6 samplesSample availability and quantity are confirmed per part number.
| Part No. | GD32L233CCT6 |
|---|---|
| Brand | GigaDevice (China) |
| Series | GD32L23x (low-power Cortex-M23 MCU) |
| Category | MCU |
| Package | LQFP-48 |
| Voltage | 1.71–3.63 V |
| Temperature | Industrial |
| Spec | Cortex-M23 64MHz, 256KB Flash / 32KB SRAM, LQFP-48, 1.71~3.63V, industrial -40~85°C |
| Application | Battery-powered devices, smart meters, portable instruments, low-power IoT terminals |
Parameters are compiled from public information for selection reference only. Always check the GigaDevice datasheet for design and ordering.
GD32L233CCT6 is a GigaDevice GD32L23x (low-power Cortex-M23 MCU) part. Spec: Cortex-M23 64MHz, 256KB Flash / 32KB SRAM, LQFP-48, 1.71~3.63V, industrial -40~85°C. Typical applications: Battery-powered devices, smart meters, portable instruments, low-power IoT terminals.
Send SUNTEC the complete part number, quantity and application to discuss alternatives and the documentation needed for evaluation.
Suzhou SUNTEC Electronics Co., Ltd. (SUNTEC) supplies GigaDevice products: 100% genuine, lot-traceable and inspected batch by batch before shipping. Quotes and lead times are usually sent within 1 business day. Use the quote form on this page, or email your BOM to suntec@suntecele.com.
Send the GD32L233CCT6 quantity and target lead time. We reply to routine RFQs within 1 business day and provide a sourcing proposal for complex BOMs within 2 business days. Weekends and public holidays are excluded. These are response and proposal times, not shipping times; lead times are confirmed per order.